logo
products
PRODUCTS DETAILS
Home > Products >
Temporary Steel Bridge For Sale / Construction Steel Structure Prefab Pedestrian Bridge

Temporary Steel Bridge For Sale / Construction Steel Structure Prefab Pedestrian Bridge

MOQ: 1 Pcs
Price: USD 95-450
Standard Packaging: Naked
Delivery Period: 8-10 work days
Payment Method: L/C,D/P,T/T
Supply Capacity: 60000ton/year
Detail Information
Place of Origin
China
Brand Name
Zhonghai Bailey Bridge
Certification
IS09001, CE
Model Number
CB200/CB321
Net Width:
3.15m,4.2m,7.35m 10.5m
Type:
Truss Bridge
Application:
Bailey Bridge
Structure Type:
Steel Bridge
Deck:
Steel Deck / Timber Deck
Main Steel:
Q345B
Bolt Grade:
Grade 8.8
Surface Finish:
Pained Or Galvanized
Structure:
Truss Bridge
Standard:
ASTM, BS, GB
Highlight:

temporary prefab pedestrian bridge

,

bs temporary steel bridge

,

gb temporary steel bridge

Product Description

Temporary Steel Bridge For Sale/construction Steel Structure Pedestrian Bridge



Jiangsu Zhonghai Bridge Equipment Co., Ltd. actively responds to the "Belt and Road" initiative and contributes to global infrastructure construction through technological innovation and high-quality products. The following are the company's main initiatives in responding to the "Belt and Road" initiative:


1. **Participation in international projects**
Following the construction pace of the "Belt and Road", the company has participated in a number of large-scale international projects, including:
- **Maldives China-Maldives Friendship Bridge**: Provided key support for infrastructure construction in the Maldives.
- **Brunei Cross-Sea Bridge**: Assisted Brunei's transportation development.
- **Pakistan Hub Power Station**: Provided high-quality bridge equipment for Pakistan's energy projects.
- **Kenya Nema Railway**: Participated in Kenya's railway construction project.
- **Malaysia East Coast Railway**: Provided technical support for Malaysia's railway construction.


2. **Technological innovation and quality control**
In order to meet the needs of the international market, the company has adopted advanced technology and strict quality control standards:
- **Automatic welding robot technology**: The introduction of automatic welding robot technology ensures that the welding accuracy is controlled within 0.3 mm, which improves product quality and production efficiency.
- **International Standard Testing**: All steel products exported by the company have been professionally tested by SGS to ensure full compliance with American and European standards.
- **Ultrasonic flaw detection**: All major welds have been ultrasonically tested to ensure full compliance with welding standards.


3. **Expanding the international market**
The company actively expands the international market, and its products have been exported to more than 20 countries and regions including Russia, Canada, and Southeast Asia. In 2024, foreign trade business accounted for one-fifth of the company's revenue, and plans to increase to 50% in the future.


4. **Promoting Chinese standards**
The company is committed to promoting "Chinese standards" and making Chinese manufacturing shine on the international stage. By participating in international projects, the company has not only enhanced its international influence, but also made important contributions to the implementation of the "Belt and Road" initiative.


5. **Future Outlook**
Jiangsu Zhonghai Bridge Equipment Co., Ltd. will continue to focus on technological innovation and market expansion to further enhance its leading position in the field of bridge equipment manufacturing. The company plans to apply for provincial-level specialized and new enterprises in the next few years and continue to expand its production scale to meet the growing market demand.

Through these initiatives, Jiangsu Zhonghai Bridge Equipment Co., Ltd. has not only established a good corporate image in the countries along the "Belt and Road", but also provided high-quality products and services for global infrastructure construction.



Specifications:

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2

​​

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity


Temporary Steel Bridge For Sale / Construction Steel Structure Prefab Pedestrian Bridge 12

products
PRODUCTS DETAILS
Temporary Steel Bridge For Sale / Construction Steel Structure Prefab Pedestrian Bridge
MOQ: 1 Pcs
Price: USD 95-450
Standard Packaging: Naked
Delivery Period: 8-10 work days
Payment Method: L/C,D/P,T/T
Supply Capacity: 60000ton/year
Detail Information
Place of Origin
China
Brand Name
Zhonghai Bailey Bridge
Certification
IS09001, CE
Model Number
CB200/CB321
Net Width:
3.15m,4.2m,7.35m 10.5m
Type:
Truss Bridge
Application:
Bailey Bridge
Structure Type:
Steel Bridge
Deck:
Steel Deck / Timber Deck
Main Steel:
Q345B
Bolt Grade:
Grade 8.8
Surface Finish:
Pained Or Galvanized
Structure:
Truss Bridge
Standard:
ASTM, BS, GB
Minimum Order Quantity:
1 Pcs
Price:
USD 95-450
Packaging Details:
Naked
Delivery Time:
8-10 work days
Payment Terms:
L/C,D/P,T/T
Supply Ability:
60000ton/year
Highlight

temporary prefab pedestrian bridge

,

bs temporary steel bridge

,

gb temporary steel bridge

Product Description

Temporary Steel Bridge For Sale/construction Steel Structure Pedestrian Bridge



Jiangsu Zhonghai Bridge Equipment Co., Ltd. actively responds to the "Belt and Road" initiative and contributes to global infrastructure construction through technological innovation and high-quality products. The following are the company's main initiatives in responding to the "Belt and Road" initiative:


1. **Participation in international projects**
Following the construction pace of the "Belt and Road", the company has participated in a number of large-scale international projects, including:
- **Maldives China-Maldives Friendship Bridge**: Provided key support for infrastructure construction in the Maldives.
- **Brunei Cross-Sea Bridge**: Assisted Brunei's transportation development.
- **Pakistan Hub Power Station**: Provided high-quality bridge equipment for Pakistan's energy projects.
- **Kenya Nema Railway**: Participated in Kenya's railway construction project.
- **Malaysia East Coast Railway**: Provided technical support for Malaysia's railway construction.


2. **Technological innovation and quality control**
In order to meet the needs of the international market, the company has adopted advanced technology and strict quality control standards:
- **Automatic welding robot technology**: The introduction of automatic welding robot technology ensures that the welding accuracy is controlled within 0.3 mm, which improves product quality and production efficiency.
- **International Standard Testing**: All steel products exported by the company have been professionally tested by SGS to ensure full compliance with American and European standards.
- **Ultrasonic flaw detection**: All major welds have been ultrasonically tested to ensure full compliance with welding standards.


3. **Expanding the international market**
The company actively expands the international market, and its products have been exported to more than 20 countries and regions including Russia, Canada, and Southeast Asia. In 2024, foreign trade business accounted for one-fifth of the company's revenue, and plans to increase to 50% in the future.


4. **Promoting Chinese standards**
The company is committed to promoting "Chinese standards" and making Chinese manufacturing shine on the international stage. By participating in international projects, the company has not only enhanced its international influence, but also made important contributions to the implementation of the "Belt and Road" initiative.


5. **Future Outlook**
Jiangsu Zhonghai Bridge Equipment Co., Ltd. will continue to focus on technological innovation and market expansion to further enhance its leading position in the field of bridge equipment manufacturing. The company plans to apply for provincial-level specialized and new enterprises in the next few years and continue to expand its production scale to meet the growing market demand.

Through these initiatives, Jiangsu Zhonghai Bridge Equipment Co., Ltd. has not only established a good corporate image in the countries along the "Belt and Road", but also provided high-quality products and services for global infrastructure construction.



Specifications:

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2

​​

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity


Temporary Steel Bridge For Sale / Construction Steel Structure Prefab Pedestrian Bridge 12